Before you contact ANP Marine — or any refrigeration service company — for a refrigerant conversion quotation, gathering the right information from your vessel will save significant time and produce a more accurate quote. Incomplete enquiries result in assumptions, which result in surprises. This guide tells you exactly what to collect.
Why this matters: A refrigerant conversion is not a simple gas swap. The new refrigerant may require different oil, new filter driers, resized expansion valves, updated controls and revised system pressures. The more information you provide upfront, the more precise the quote — and the fewer unexpected costs during the job.
1. Current Refrigerant Information
Refrigerant designationR22, R404A, R407C, R410A, R134a or other. Check the nameplate and the F-Gas logbook.
Total system charge (kg)From the F-Gas equipment log, service records or nameplate. If unknown, note the receiver/cylinder sizes.
GWP and CO₂-equivalentUsed to determine leak check frequency under F-Gas regulations. Your current logbook should show this.
Current oil typeMineral, alkylbenzene (AB) or POE. This determines whether an oil flush is required for the new refrigerant.
2. Compressor Details
Make and modelBITZER, Grasso, Carrier, Copeland, Mycom etc. Photograph the nameplate — do not rely on memory.
Serial numberRequired to identify correct valve plates, gaskets and approved refrigerant alternatives for that specific model.
Year of manufactureOlder compressors may not be approved for certain HFO blends. Year determines available retrofit options.
Running hoursHeavily run compressors may require overhaul before conversion. Include hours since last major service.
Compressor typeReciprocating, screw, scroll or rotary. This affects oil type, conversion approach and expected performance change.
Number of compressors and circuitsHow many independent refrigeration circuits does the system have? Are they stand-alone or connected?
3. System Components
Expansion valve type and modelTEV (thermostatic), electronic or capillary tube. TEV may need resizing or replacement for the new refrigerant.
Filter drier size and connectionsWill almost always need replacing during conversion. Note the connection sizes (ODF, flare or solder).
Condenser typeAir-cooled, water-cooled or seawater-cooled. Affects heat rejection and suitability for higher-pressure refrigerants.
Evaporator type and applicationProvision plant, cargo hold, chiller barrel or direct expansion. Each has different requirements for the replacement gas.
Control system / thermostatAnalogue pressostats or electronic controllers? Electronic systems may need recalibration or replacement for new refrigerant pressure ranges.
Sight glass and moisture indicatorNote current colour — moisture present? Needs replacing with desiccant rated for new refrigerant.
4. Current System Condition
Provide an honest assessment of the system's condition. A conversion performed on a system with pre-existing faults will not resolve those faults and may introduce new ones.
Known leaks or refrigerant lossHas refrigerant been topped up repeatedly? Where is the suspected leak? Conversion cannot mask a leaking system.
Current suction and discharge pressuresRecord at normal operating conditions. Helps engineers predict performance change with the new refrigerant.
Suction and discharge temperatures (°C)Superheat and subcooling values help assess TEV setting and whether the valve is correctly sized.
Compressor discharge temperatureHigh discharge temperatures can indicate oil breakdown, wrong refrigerant charge or poor TEV operation.
Any history of contaminationMoisture, air or non-condensables in the system? Acid test results if available. This affects conversion approach.
Recent service historyWhat has been replaced or repaired in the last 2 years? This prevents duplication and helps scope the conversion correctly.
5. Vessel and Operational Information
Vessel name and IMO numberRequired for F-Gas documentation and class notification.
Flag state and classification societySome refrigerants require class approval before use. Your flag state may have specific documentation requirements.
Planned drydock or port call dateConversion timing relative to your next drydock determines the work scope and urgency. Earlier notice = better parts availability and pricing.
Vessel current location and next portRequired for engineer mobilisation planning and parts delivery logistics.
6. Photographs — These Are Essential
No quotation can be fully accurate without photographs. Send clear, well-lit images of:
- Compressor nameplate (both sides if labels are on different faces)
- Full system overview — compressor, condenser, evaporator in frame
- Expansion valve — including the bulb and equaliser line if visible
- Filter drier — showing the connections and any moisture indicator
- Sight glass and any visible pipework
- Any visible defects, corrosion, oil staining or frost patterns
- Control panel or thermostat
Use the ANP Refrigerant Conversion Questionnaire — it guides the chief engineer through every point above, with photo upload prompts and system detail fields. The completed questionnaire produces a PDF that contains everything an engineer needs to produce an accurate quote. No back-and-forth, no missing information.
Ready to request a quote? Send completed information to
[email protected] or use the questionnaire tool.